THE VILLA ON ERICKSON

Dec 23
Permalink
The in cabinet lighting starts to go in, such as this location in the Butler’s pass-thru.

The in cabinet lighting starts to go in, such as this location in the Butler’s pass-thru.

Permalink
The island is going to go in….somehow.

The island is going to go in….somehow.

Permalink
The laundry cabinetry turned out well—here is a picture of an upper with some corbels and coat hooks below…

The laundry cabinetry turned out well—here is a picture of an upper with some corbels and coat hooks below…

Permalink
Custom return grills were made by the railing company to match the railing. We then painted the interior of the window seat (where the return air was installed) so nothing could be seen inside..

Custom return grills were made by the railing company to match the railing. We then painted the interior of the window seat (where the return air was installed) so nothing could be seen inside..

Permalink
One of my favorite parts of this house is the lighting—here is a close up of the exterior. I will get some interior light fixture shots soon….

One of my favorite parts of this house is the lighting—here is a close up of the exterior. I will get some interior light fixture shots soon….

Permalink
A look at the custom door and iron gate that will be for the wine cellar.

A look at the custom door and iron gate that will be for the wine cellar.

Permalink
Whewww!

Whewww!

Dec 22
Permalink
Testing out the bar fireplace…it has been working for a little while, but until just recently did we get the rock installed the right way around the arched face…

Testing out the bar fireplace…it has been working for a little while, but until just recently did we get the rock installed the right way around the arched face…

Permalink
A look at the back of the bar, where we utilized matching rock from the fireplace and exterior….

A look at the back of the bar, where we utilized matching rock from the fireplace and exterior….

Permalink
The GE Monogram Fridge is installed. The finished panels are currently being stained off-site, and will be installed soon.

The GE Monogram Fridge is installed. The finished panels are currently being stained off-site, and will be installed soon.

Permalink
The bar appliances are starting to get installed. A microwave drawer, a dishwasher drawer, and beverage fridge provide all the needed amenities for such an entertaining space…

The bar appliances are starting to get installed. A microwave drawer, a dishwasher drawer, and beverage fridge provide all the needed amenities for such an entertaining space…

Permalink
The golden slate was chosen for the 2 upper decks. Here, the front balcony is almost completed and will be grouted soon. Then, the custom railing will be installed to finish off the space.

The golden slate was chosen for the 2 upper decks. Here, the front balcony is almost completed and will be grouted soon. Then, the custom railing will be installed to finish off the space.